Bremen, GA/Serving West Georgia & metro Atlanta
CDM Systems.Free assessment

The one part of the jobYou Will Actually Touch.

Network racks, patch panels, cable management, power and airflow — plus Synology NAS for local storage and backup, and the configuration, coverage testing and documented handoff that turn a pile of working equipment into a system somebody can maintain. Bremen, Carrollton and across West Georgia.

Network racksWall-mount or floor
/
Patch panelsEvery port labeled
/
Synology NASStorage kept on site
/
CommissionedTested and documented

Where this usually starts

New rack, old closet,Or nothing backed up.

Three different phone calls that end at the same place — equipment mounted where it can be serviced, cable that can be followed, and storage that is doing what somebody assumed it was already doing.

01 / New rack

Sized for what goesin it next.

A rack gets built once and then lived with for years. It should hold the equipment going in today and the two things nobody has mentioned yet — the second switch, the recorder, the NAS.

  • Wall-mount or floor rack chosen for the room it has to live in
  • Patch panels and switches laid out in the order cable arrives
  • Space left on purpose for what gets added later
  • Enough clearance to get behind it without moving furniture
Structured cabling
02 / Closet cleanup

Grew one emergencyat a time.

A wiring closet, or the corner of a server closet, or a cabinet in a back room. Nothing labeled, nothing written down, dead runs still patched in, and a switch balanced on top of the router.

  • Every live run traced and tested before anything is unplugged
  • Dead runs retired instead of coiled up and left in place
  • The whole thing re-terminated onto panels and dressed properly
  • Cutover scheduled around your business day wherever it can be
Business networks
03 / Storage & backup

The files a businesscannot lose.

Camera footage, drawings, the accounting file, twenty years of church records. A Synology NAS keeps them in the building on hardware you own, instead of only on the desktop under somebody’s desk.

  • Synology NAS sized to what is actually being stored
  • Camera recording kept on site rather than on a subscription
  • Backup jobs configured, scheduled, and then actually tested
  • Plain instructions for whoever has to restore a file at 7am
Service plans

What the work is

Six things that decideHow the next fix goes.

A rack is the difference between a five-minute fix and an afternoon of tracing. Nothing on this list is difficult. All of it is what gets left out when a job is priced to be the cheapest bid in the stack.

Start a project

Sizing & mounting

Wall-mount or floor rack picked for the room it has to live in, then mounted into something that will actually carry it. Sized for what goes in it now and what goes in it next — adding one unit later should not mean buying the rack twice.

01

Patch panels & termination

Cable lands on a patch panel, not on the back of a switch. Every port terminated to the pinout, numbered, and matched to the jack at the far end — so finding a run means reading a label instead of pulling on a cable and watching what moves.

02

Cable management & dressing

Horizontal and vertical management, patch leads cut to length instead of coiled, bundles dressed so that following one cable does not mean moving nine others. This is the part that decides whether the closet is still tidy in three years.

03

Power & airflow

Power laid out so plugs are reachable and nothing is hanging on its own weight. Equipment spaced and oriented so hot air has somewhere to go, and service clearance kept front and back, because a closet that cooks its own switch does it in July.

04

NAS & local backup

A Synology NAS for the files and the camera footage that should stay in the building. Shares set up per user or per department, backup jobs scheduled, and a restore run while we are still standing there. A backup only counts once somebody has restored from it.

05

Commissioning & handoff

Every device configured, firmware brought current, coverage tested by walking the building rather than by looking at a dashboard, and the whole thing written down. Then somebody at your end gets shown how to use the parts they will touch.

06

Laid out first

A rack is not decoration.It is a maintenance decision.

This is the one part of the job you will open, look at and put your hands on for the next ten years. What it looks like inside is decided on paper, before anything is mounted.

RACK ELEVATION / 12UPATCH PANEL · 24 PORTCABLE MANAGERPATCH PANEL · 24 PORTCABLE MANAGERPOE SWITCH · 24 PORTGATEWAY / FIREWALLUNIFI PROTECT NVRSYNOLOGY NASUPS / BATTERY BACKUPAIRFLOW · SERVICE ACCESS · ROOM TO GROW

Rack elevation

Where each unit sits, which way the airflow runs, how much room stays free on purpose, and how you get at the back of it.

RISER / RACK TO JACKSLEEVED CONDUIT · ROOM FOR THE NEXT PULLSECOND FLOORMAIN FLOORBASEMENT / MECHRACKSERVICE LOOPLABELED AT BOTH ENDS · TESTED BEFORE THE WALL CLOSES

The way in

How runs arrive at the rack — sleeved, supported and with a service loop left, so the bundle can be dressed instead of stretched.

NETWORK MAP / HANDOFF DOCUMENTISP · FIBERPRIMARY5G CELLULARAUTO FAILOVERGATEWAY + FIREWALLUNIFIPOE SWITCH · 24 PORTVLAN SEGMENTEDMAINIoT / GUESTCAMERASACCESS POINTS× 4SMART / AVISOLATEDUNIFI PROTECT× 6 CAMERASSYNOLOGY NASLOCAL BACKUPNVR RECORDERON SITE · NO CLOUDYOU KEEP THIS. SO DOES WHOEVER COMES AFTER US.

What it feeds

The rack drawn as part of the network it serves, so it is obvious in advance what stops when one unit is powered down.

What you keep

Most jobs leave a closet.This one leaves a packet.

Six months from now, the difference between this and a cheaper bid does not show up in a photograph. It shows up in whether anybody can work out what is plugged into port fourteen without unplugging it to find out.

PATCH PANEL / 24 PORTJACK 114 → PORT 114101102103104105106107108109110111112113114115116117118119120121122123124SWITCHTESTED · EVERY PORTLABELLED AT BOTH ENDS
The port map / every job
01

A rack you can read

Panels, management and a layout where any cable can be followed by eye. A rack nobody can read is a rack nobody will maintain.

02

The port map

Which panel port feeds which jack, which switch port feeds which panel port, and what is left spare. In writing, not in somebody’s head.

03

Configuration & logins

Device list, addresses, network segments and the admin credentials — in your name. You should never have to call us to get into your own equipment.

04

A backup that was tested

We restore a file in front of you before we leave. Until that has happened once, nobody actually knows whether the backup works.

Our lane

Rack buildouts and wiring closet cleanups, patch panels and terminations, cable management, power layout and airflow, Synology NAS for local storage and backup, then configuration, coverage testing and the documentation you keep.

Not our lane

Line-voltage electrical. If the closet needs a new circuit or an outlet moved, that is an electrician, and you will hear that before we start rather than halfway through. Cooling as well — we can lay a rack out for airflow, but we cannot air-condition a closet that was never meant to hold equipment. Desktop, server and email administration stays with whoever handles your IT.

Common questions

Asked in front ofThe open closet door.

Usually by whoever inherited the closet from somebody who has since left, and who would rather not be the one holding it together.

How much does it cost to clean up a wiring closet?

It depends on what is in there and how much of it is still live. The things that move the number are how many runs have to be traced and re-terminated, whether the existing rack can be reused or the whole thing gets rebuilt, how much of the work has to happen outside business hours, and whether storage or backup is going in at the same time. We will not quote a closet from a photograph. The assessment is free, we open the door and look at it, and a written quote follows that.

01

Do we really need a rack, or can the equipment sit on a shelf?

Equipment on a shelf works right up until somebody has to change something. Then there is nowhere to land a patch panel, no way to label anything, nothing carrying the weight of the cable, and no airflow other than whatever the room happens to have. A rack is not there to look serious. It is there so the next person can see what is connected to what, and so a switch is not resting on a router that is resting on a modem.

02

Does a NAS mean our files are backed up?

Not on its own. A NAS is storage. It becomes a backup when something is scheduled to copy to it, and it only counts as a backup once somebody has actually restored a file from it — which is a test we run before we leave. It is also worth being plain about the limit. A NAS sitting in the same building as the machines it protects is one fire, flood or theft away from being no backup at all. It covers a deleted file, a failed drive and a bad Monday. It does not cover the building.

03

Can you rebuild the closet without taking us offline during the day?

Most of it, yes. Mounting the rack, installing panels, running new patch cable and dressing bundles all happen while people are working. The cutover — the part where live runs move onto the new panels — is what takes things down, and that gets scheduled for whenever it hurts least: an evening, an early morning, a Saturday, or between services. You are told which parts drop and roughly for how long before we start, not afterwards.

04

What do we actually get at the end of it?

A rack somebody can work in, a port map that says which panel port feeds which jack, the configuration and the admin logins in your name, and instructions for the parts you will touch. It is standard equipment on standard configuration, so you are not tied to us. If you hire somebody else in three years, they can read what we left and pick it straight up. That is the whole point of writing it down.

05

Where we build racks

Based in Bremen.Hands on the rack.

A closet cannot be tidied over the phone. Everything below is inside a comfortable drive of the shop, which also means we can come back to it.

Same-day radius

Haralson & Carroll County
Bremen, GAWaco, GABuchanan, GATemple, GAMt. Zion, GATallapoosa, GACarrollton, GAVilla Rica, GABowdon, GA

Regularly serving

Douglas · Paulding · Coweta · Polk
Cedartown, GARockmart, GADouglasville, GADallas, GAHiram, GANewnan, GAPowder Springs, GAPeachtree City, GA

No cost, no obligation

Start with aFree network assessment.

Open the closet door and we will tell you what is live, what is dead, what is worth keeping and what a rebuilt rack would take. If there is storage in there, we will also tell you plainly whether anything is genuinely being backed up. You get the findings whether or not you hire us.

Typical response — same business day